To best check out this page, please, go to the desktop version.
Actualités & projets

Actualités & projets

STRUCTURAL STRENGTH
IN HEAVY STEEL PLATES

Actualités & Projets

Germany’s Environment Minister visits Dillinger
JANVIER 23 - 2020  

Germany’s Environment Minister visits Dillinger

Germany’s Environment Minister visits steel industry in Saarland Saarstahl and Dillinger demonstrate commitment to green steel.

Svenja Schulze, Germany’s Minister for the Environment, Nature Conservation and Nuclear Safety, visited the Dillinger steel rolling plant together with Saarland’s Economics and Energy Minister Anke Rehlinger, Environment Minister Reinhold Jost and District Administrator Patrik Lauer.

“We are thankful that you have come to see for yourself how the Saarland steel industry is helping achieve the climate targets,” said Peter Schweda, Chief Human Resources Officer and Labor Director of Dillinger and Saarstahl, as he welcomed the Minister. “We want green steel and are prepared to do our part for climate change. To accomplish this transformation process, we need political support and a reliable political framework,” Schweda added. He also emphasized that there are concrete options for reducing carbon, provided that politicians create the necessary conditions in coming months.

The Minister was able to see first-hand the importance Saarland’s steel industry holds for the energy transition as she observed steel plate for offshore wind turbines being rolled at the plant. Dillinger is a global market leader for monopile foundation structures in the offshore wind turbine segment. 

Environmental protection in production was also a topic during the federal minister's visit. Around 36 percent of all investments made at the Dillingen site in recent years – totaling around €500 million – were for environmental protection measures. Additional environmental investments in the millions are currently being planned or are already being implemented. Construction of a coke gas injection plant that replaces some of the carbon used as a reducing agent with hydrogen marks the first steps being taken toward hydrogen-based steel production. 

Board member Peter Schweda stated: “The energy transition will not be possible without steel.” The commitment of Dillinger and Saarstahl to environmentally friendly production must not be allowed to become a disadvantage in global competition.

About Dillinger
Aktien-Gesellschaft der Dillinger Hüttenwerke (Dillinger), founded in 1685, is a world leader today in the manufacture of high-grade heavy plate steel. The Dillinger Group employs a total of around 7,400 people and has an annual turnover of around two billion euros. High-tech plate from Dillinger is used to realize extraordinary and technically sophisticated projects all over the globe, including in the areas of steel construction, engineering, offshore, offshore wind power, and line pipe and boiler construction. More information can be found at www.dillinger.de.

Source: Dillinger

  < Retour à la vue d’ensemble

POURQUOI CHOISIR AWS?

  • 100 000 tonnes de stock disponibles
  • Une qualité certifiée et garantie
  • Autorisation de remarquage et une traçabilité totale
  • Des tôles sur mesure, fruit de longues années d’expérience et de techniques de découpe à la pointe de la technologie
  • Des spécialistes pour vous donner des conseils personnalisés
Dillinger

CONTACT

Envoyez votre demande
Voyez nos coordonnées
Adresse 
Damweg 12
4905 BS Oosterhout
Pays-Bas

 

Adresse GPS
Damweg 12

Horaires de bureau
Lundi - Jeudi        08:00 - 17:00
Vendredi              08:00 - 16:00

Horaires de chargement
Lundi - Jeudi       07:30 - 16:00
Vendredi             07:30 - 15:00
Pause-déjeuner  12:00 - 13:00

Numéro de TVA
NL001862534 B01

Chambre de commerce
Zuidwest Nederland

20031659

Suivez-nous sur LinkedIn Regardez-nous sur YouTube

 

CONDITIONS GÉNÉRALES DE LIVRAISON PRIVACY STATEMENT
2024 © ANCOFERWALDRAM STEELPLATES | BUREAUKICKER